01

02

Your space. Your charger.

A charge point sized for your car and your supply, on its own protected circuit, installed by an IRVE-qualified electrician. In your garage, on your drive, or on your space in a shared car park.

03

Which power?

7.4 kW

house, single-phase supply

11 kW

three-phase supply

22 kW

shared car park, business

The rules, in plain words

Above 3.7 kW, not just any electrician

IRVE qualification

French regulation requires a qualified installer for any charge point above 3.7 kW. It is also what grants and your insurer will ask for.

The right to plug in

In a shared building, the « droit à la prise » lets you equip your own space. We prepare the file for the managing agent.

Your supply checked first

Subscribed power, board, cable run: we check what the house can take, and fit load management so charging never trips the main breaker.

Ten-year insurance

Certificate sent with the quote, commissioning report handed over at the end.

Where we install

Follow the signs

69001

City centre

under 45 min

69100

East suburbs

under 1 h 15

69004

North bank

under 1 hour

69005

Old town

under 1 hour

69110

South plateau

under 1 h 15

69340

Western villages

same day

Technical visit

Mark out your space

Three things make the price of a charge point. Tell us what you know, we check the rest on site.

  1. AThe distance between your board and the space
  2. BYour subscribed power, printed on your electricity bill
  3. CA house, a shared car park, or business premises

Free visit and quote, no obligation. Your details stay with us.